Is it possible to use the BEIHAI Charging Post in rainy weather?

BEIHAI charging pile its function is similar to the gas station inside the gas pump, can be fixed on the ground or wall, installed in public buildings (public buildings, shopping malls, public parking lots, etc.) and residential district parking or charging station, can be based on different voltage levels for various types of electric vehicle charging. With the development of new energy vehicles is getting better and better, for new energy vehicles charging pile, the degree of acceptance is also higher and higher, in the use of new energy vehicles, charging as a new energy vehicle energy to replenish the source of the way, charging can be for new energy vehicles to provide the required range, in the charging, once it rains many people’s hearts are full of concerns, for new energy vehicles. High degree of electrification, for the charging pile for the rain can also be charged, but in the rain when charging need to strictly follow the use and operation instructions to use, to ensure that the charging of the smooth. From the point of view of the use of vehicles, charging and other components have serious design standards, at the same time for the requirements of the charging pile is also a strict requirement standards, the International Electrotechnical Commission drafted the IP protection level data show that the waterproof level of electrical appliances can be divided into a total of IPX1 to IPX8, and charging piles of the level of protection, charging system using the level of protection of IPX5, the protection level of charging gun to IPX6, from the charging pile of the level of protection, the charging system using the level of protection of IPX5, charging gun The protection level of charging pile reaches IPX5 for charging system, IPX6 for charging gun, and IP6 or IP7 for vehicle waterproof standard. From the standard point of view, the national standard on the charging interface of the normal requirements are very strict, charging before the start of the vehicle side and the pile side should be insulated to monitor, and secondly from the charging pile and vehicle charging, in the charging gun inserted into the vehicle charger after the CMS system (Charge Management System) first to confirm that the charging environment is appropriate, after all, charging piles are all high-voltage, so you need to make sure that the vehicle’s charging is normal, once a problem occurs Charging gun will not start charging, fundamentally circumvent the leakage problem, to protect the charging behavior of personal rights and interests. Secondly, these DC piles (fast charging) are also equipped with input over-voltage, short-circuit protection, and other powerful protection features on the basis of AC piles, so that when charging in rainy days, the protection of piles and people is in advance and sufficient. So charging in rainy days is basically no problem.

BEIHAI charging pile its function is similar to the gas station inside the gas pump, can be fixed on the ground or wall, installed in public buildings (public buildings, shopping malls, public parking lots, etc.) and residential district parking or charging station, according to the different voltage levels for a variety of models of electric vehicle charging. With the development of new energy vehicles is getting better and better, for new energy vehicles charging pile, the degree of acceptance is also higher and higher, in the use of new energy vehicles, charging as a new energy vehicle energy to replenish the source of the way, charging can be for new energy vehicles to provide the required range, in the charging, once it rains many people’s hearts are full of concerns, for new energy vehicles. High degree of electrification, for the charging pile for the rain can also be charged, but in the rain when charging need to strictly follow the use and operation instructions to use, to ensure that the charging of the smooth.

From the point of view of the use of vehicles, charging and other components have serious design standards, at the same time for the requirements of the charging pile is also a strict requirement standards, the International Electrotechnical Commission drafted the IP protection level data show that the waterproof level of electrical appliances can be divided into a total of IPX1 to IPX8, and charging piles of the level of protection, charging system using the level of protection of IPX5, the protection level of charging gun to IPX6, from the charging pile protection level, the charging system uses a level of protection of IPX5, charging guns The protection level of charging pile reaches IPX5 for charging system, IPX6 for charging gun, and IP6 or IP7 for vehicle waterproof standard. From the standard point of view, the national standard on the charging interface of the normal requirements are very strict, charging before the start of the vehicle side and the pile side should be insulated to monitor, and secondly from the charging pile and vehicle charging, in the charging gun inserted into the vehicle charger after the CMS system (Charge Management System) first to confirm that the charging environment is appropriate, after all, charging piles are all high-voltage, so you need to make sure that the vehicle’s charging is normal, once a problem occurs Charging gun will not start charging, fundamentally circumvent the leakage problem, to protect the charging behavior of personal rights and interests.

Secondly, these DC piles (fast charging) are also equipped with input over-voltage, short-circuit protection, and other powerful protection features on the basis of AC piles, so that when charging in rainy days, the protection of piles and people is in advance and sufficient. So charging in the rain is basically no problem.

_cuva


Post time: Jun-18-2024